{"id":4092,"date":"2016-06-30T10:48:13","date_gmt":"2016-06-30T09:48:13","guid":{"rendered":"https:\/\/www.kanadevia-inova.com\/cms\/?p=4092"},"modified":"2016-06-30T10:48:13","modified_gmt":"2016-06-30T09:48:13","slug":"ferrybridge-multifuel-2-hitachi-zosen-inova-builds-on-success-story","status":"publish","type":"post","link":"https:\/\/archive.kanadevia-inova.com\/fr\/ferrybridge-multifuel-2-hitachi-zosen-inova-builds-on-success-story\/","title":{"rendered":"Ferrybridge Multifuel 2 \u2013 Kanadevia Inova Builds on Success Story"},"content":{"rendered":"<p><strong>Swiss technology company to deliver Europe\u2019s largest energy-from-waste plant undertaken by an individual contractor<\/strong><br \/>\n<em>Following on from the successful completion of the first energy-from-waste plant (WtE) in Ferrybridge (UK), the Swiss clean-tech company Kanadevia Inova has received the order to construct the second facility. The company\u2019s ninth project in the UK will mark a new milestone. The complete plant, consisting of a total of four lines, ranks among Europe\u2019s largest and most efficient WtE plants.<\/em><br \/>\nAfter the successful construction of Ferrybridge Multifuel 1 (FM1) in 2015, the kick off for Ferrybridge Multifuel 2 (FM2) has become reality. The engineering, procurement, and construction (EPC) contract has been awarded to Swiss Kanadevia Inova, which already provided its first-class technology for FM1 and served as general contractor. The contract between Kanadevia Inova and the client SSE plc came into force on June 30, 2016. \u201cKanadevia Inova proved itself to be an exceptionally constructive and reliable partner in the realization of FM1. We therefore have absolute confidence in working with them again and anticipate as with FM1 that jobs will be created either direct or indirect as a consequence of the FM2 project\u201d said Charlie Cryans, Head of Construction for SSE UK and Ireland<br \/>\nWith a remarkable boiler capacity of 117.4 MWthermal, FM2 will achieve the same outstanding efficiency as its sister plant.<br \/>\n<strong>Utmost Energy Efficiency from Diverse Fuel Sources<\/strong><br \/>\nUsing a thermal WtE process, FM2 will annually handle around 570,000 tonnes of waste-derived fuel from various sources such as municipal solid waste, commercial and industrial waste and waste wood. The plant will be producing enough energy to power around 170,000 homes. With net energy efficiency of 31%, it will be on a par with its sister plant and will also rank among the top facilities in Europe in this regard. Achieving these values was one of the criteria for Kanadevia Inova securing this project. Kanadevia Inova CEO Franz-Josef Mengede stressed: \u201cWe are proud to be chosen for a repeat order by SSE based on trust in our technological performance as well as our capability to deliver complex turn-key projects safely, on time and at a high quality level.\u201d<br \/>\n<strong>Boost for the Regional Economy<\/strong><br \/>\nIn addition to energy recovery, the project will also add economic value, this not least contributing to the exceptionally high support from the population. As with FM1, the construction of FM2 will also benefit local businesses. \u201cTogether we can thus make an important contribution to a sustainable and green economy,\u201d emphasized Franz-Josef Mengede.<br \/>\nThe new project is worth a total of over CHF 360 million. Initial building work is likely to start in July 2016, with the first waste fire expected in 2018.<br \/>\n<a title=\"Kanadevia Inova to build FM2\" href=\"https:\/\/archive.kanadevia-inova.com\/files\/2016\/06\/Media-release_HZI-to-build-FM2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Download media release<\/a><br \/>\n<a title=\"Ferry Bridge Multifuel 1\" href=\"https:\/\/archive.kanadevia-inova.com\/files\/2016\/06\/FM1_Aerial_0815.jpg\" target=\"_blank\" rel=\"noopener noreferrer\">Download Picture of FM1<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Swiss technology company to deliver Europe\u2019s largest energy-from-waste plant undertaken by an individual contractor Following on from the successful completion of&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[158],"tags":[236,118,166,238,239,240,160,182,221,167,168,204,237,119,205],"class_list":["post-4092","post","type-post","status-publish","format-standard","hentry","category-news","tag-arbeitsplatze","tag-energy-from-waste","tag-ferrybridge","tag-gewerbeabfalle","tag-grossbritannien","tag-haushaltsabfalle","tag-hzi","tag-hitachi-zosen-inova","tag-multifuel","tag-sse","tag-uk-company","tag-waste-to-energy","tag-Waste-to-Energy","tag-WtE","tag-wte"],"acf":[],"_links":{"self":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/4092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/comments?post=4092"}],"version-history":[{"count":0,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/4092\/revisions"}],"wp:attachment":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/media?parent=4092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/categories?post=4092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/tags?post=4092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}