{"id":6877,"date":"2013-04-19T15:38:17","date_gmt":"2013-04-19T14:38:17","guid":{"rendered":"https:\/\/www.kanadevia-inova.com\/relaunch\/?p=1357"},"modified":"2013-04-19T15:38:17","modified_gmt":"2013-04-19T14:38:17","slug":"hitachi-zosen-inova-to-build-its-first-energy-from-waste-plant-in-poland","status":"publish","type":"post","link":"https:\/\/archive.kanadevia-inova.com\/fr\/hitachi-zosen-inova-to-build-its-first-energy-from-waste-plant-in-poland\/","title":{"rendered":"Kanadevia Inova to build its first energy-from-waste plant in Poland"},"content":{"rendered":"<p><strong><em>Kanadevia Inova has been given in consortium the EPC contractor role in\u00a0<\/em><\/strong><strong><em>building an energy-from-waste (WtE) plant for the Polish city of Poznan. The new facility\u00a0<\/em><\/strong><strong><em>is the centerpiece of Poland\u2019s largest public-private partnership project to date, and Kanadevia Inova\u2019s\u00a0<\/em><\/strong><strong><em>first WtE project in the country.<\/em><\/strong><br \/>\nThe contract for the Poznan project, awarded on April 10, 2013, underscores Kanadevia Inova\u2019s success as\u00a0an experienced and reliable technology partner for public-private partnerships (PPPs), and its\u00a0leading position in the production of thermal energy from household and commercial waste\u00a0(WtE). \u201cHaving successfully delivered various WtE plants within PPP projects in the UK in recent\u00a0years, we\u2019re particularly delighted to have won the contract for the city of Poznan. This is a new\u00a0market for us, and we look forward to contributing our rich experience and expertise,\u201d says Dr.\u00a0Helen Gablinger, Head of Sales at Kanadevia Inova.<br \/>\n<strong>State-of-the-art technology<br \/>\n<\/strong>The consortium\u2019s client is SITA Zielona Energia, a joint venture between SITA Polska and\u00a0Maguerite Fund that the city of Poznan has entrusted with the design, construction, financing and\u00a0operation of the plant over a period of 25 years. Under the leadership of Kanadevia Inova, consortium\u00a0partners Hochtief Polska S.A. and Hochtief Solutions AG are responsible for the civil works\u00a0design and construction of the plant. Kanadevia Inova will design, deliver and install the entire process\u00a0technology, drawing on its latest innovations in grate firing, the Inova grate, and DyNOR, a\u00a0proprietary SNCR-based system that is guaranteed to reduce nitrogen dioxide levels to 100\u00a0mg\/Nm3 \u2013 half the current EU limit \u2013 with minimal ammonia slip. Completing Kanadevia Inova\u2019s package of\u00a0plant technology is a modern bottom ash treatment plant enabling, particularly, the metallic\u00a0residues in the bottom ash to be recovered efficiently.<br \/>\n<strong><br \/>\nElectricity and heat for the region<br \/>\n<\/strong>The permitting process is likely to last until the second quarter of 2014, after which the\u00a0consortium can start construction work. The energy-from-waste plant should go into operation in\u00a0mid-2016.With a capacity of 210,000 tonnes of waste a year, an electrical production of up to 18\u00a0MW and a district heat output of up to 34 MW, the new plant will make a substantial contribution\u00a0to the local supply of energy, fully meeting the EU\u2019s expectations in terms of the efficient\u00a0production of Waste to Energy.<br \/>\n<img decoding=\"async\" class=\"alignnone size-full wp-image-359\" src=\"https:\/\/archive.kanadevia-inova.com\/relaunch\/wp-content\/uploads\/2014\/11\/pdf1.png\" alt=\"pdf\" width=\"18\" height=\"18\" \/><a href=\"https:\/\/archive.kanadevia-inova.com\/files\/2014\/12\/20130419_HZI-baut-Energy-from-Waste-Anlage-in-Polen.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"> Kanadevia Inova baut Energy-from-Waste Anlage in Polen<\/a><br \/>\n<img decoding=\"async\" class=\"alignnone size-full wp-image-359\" src=\"https:\/\/archive.kanadevia-inova.com\/relaunch\/wp-content\/uploads\/2014\/11\/pdf1.png\" alt=\"pdf\" width=\"18\" height=\"18\" \/>\u00a0<a href=\"https:\/\/archive.kanadevia-inova.com\/files\/2014\/12\/20130419_HZI-build-its-first-EfW-plant-in-Poland.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Kanadevia Inova build its first WtE plant in Poland<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kanadevia Inova has been given in consortium the EPC contractor role in\u00a0building an energy-from-waste (WtE) plant for the Polish city of&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[158],"tags":[173,174,119],"class_list":["post-6877","post","type-post","status-publish","format-standard","hentry","category-news","tag-poland","tag-sita-polska","tag-WtE"],"acf":[],"_links":{"self":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/6877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/comments?post=6877"}],"version-history":[{"count":0,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/6877\/revisions"}],"wp:attachment":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/media?parent=6877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/categories?post=6877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/tags?post=6877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}