{"id":6890,"date":"2018-01-26T12:00:27","date_gmt":"2018-01-26T11:00:27","guid":{"rendered":"https:\/\/www.kanadevia-inova.com\/cms\/?p=6407"},"modified":"2025-12-16T09:05:40","modified_gmt":"2025-12-16T08:05:40","slug":"cory-and-hzi-to-build-efw-plant-in-uk-capital","status":"publish","type":"post","link":"https:\/\/archive.kanadevia-inova.com\/fr\/cory-and-hzi-to-build-efw-plant-in-uk-capital\/","title":{"rendered":"CORY and Kanadevia Inova to Build WtE Plant in UK Capital"},"content":{"rendered":"<p><em><strong>A new energy-from-waste plant is set to be built in Southeast London. Client CORY has once again opted to collaborate with Swiss technology provider Kanadevia Inova. Augmenting the existing Riverside Energy Recovery Facility, the new plant would ultimately handle around 650,000 t\/a of municipal solid waste from the UK capital. <\/strong><\/em><br \/>\nSwiss clean-tech company Kanadevia Inova and CORY, one of the UK\u2019s leading players in recycling, energy recovery, and resource management, have signed a joint development agreement setting down the terms of collaboration to develop, plan, and construct the second Riverside Energy Recovery Facility in London. The two companies cooperated successfully to deliver the first Riverside facility in 2011. This is already Kanadevia Inova\u2019s eleventh project in the UK.<br \/>\nNicholas Pollard, CEO of Cory Riverside Energy, is evidently satisfied: \u201cThe collaboration with Kanadevia Inova on the first project was a great success. The plant isn\u2019t just the largest in the UK, but it\u2019s also seen as one of the most reliable. Kanadevia Inova has continually proven its expertise as a technology provider and general contractor.\u201d<br \/>\n<strong>Energy Park for Carbon-neutral Technologies<\/strong><br \/>\nLike its sister plant, the new facility would be built on the Belvedere site in Southeast London. Subject to planning approval, construction is scheduled to start in 2021. Both plants will be part of a planned local energy park which would go into operation in 2024. The new facility has the potential to recycle around 650,000 tons of solid municipal waste per year to generate electricity and heat for some 140,000 London households.<br \/>\n\u201cWe share Cory\u2019s vision of a plant that makes a major contribution to efforts to recycle even more of London\u2019s waste and increase the share of fossil-free sources in the UK capital\u2019s energy supply,\u201d said Kanadevia Inova CEO Bruno-Fr\u00e9d\u00e9ric Baudouin. \u201cAfter our successful collaboration on the first project, we look forward to renewing our partnership with CORY to repeat the success of the first Riverside facility.\u201d<br \/>\nBesides the energy generated, another point in the project\u2019s favor is reductions in carbon emissions. Delivering waste by boat via the Thames reduces the number of truck journeys by around 80,000 a year. The result is a reduction in carbon of around 200 kilos per ton of waste or 120,000 tons a year. This is in line with the mayor of London\u2019s plan, and has an extremely positive impact on the city\u2019s carbon footprint.<br \/>\n<a href=\"https:\/\/archive.kanadevia-inova.com\/files\/2018\/01\/CORY-and-HZI-to-build-EfW-Plant-in-UK-Capital.pdf\">Download media release<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>A new energy-from-waste plant is set to be built in Southeast London. Client CORY has once again opted to collaborate with&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[980,158],"tags":[],"class_list":["post-6890","post","type-post","status-publish","format-standard","hentry","category-export","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/6890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/comments?post=6890"}],"version-history":[{"count":1,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/6890\/revisions"}],"predecessor-version":[{"id":17920,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/posts\/6890\/revisions\/17920"}],"wp:attachment":[{"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/media?parent=6890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/categories?post=6890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/fr\/wp-json\/wp\/v2\/tags?post=6890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}