{"id":6899,"date":"2018-11-05T10:11:14","date_gmt":"2018-11-05T09:11:14","guid":{"rendered":"https:\/\/www.kanadevia-inova.com\/cms\/?p=6784"},"modified":"2018-11-05T10:11:14","modified_gmt":"2018-11-05T09:11:14","slug":"hzi-consortium-signs-20-year-waste-supply-agreement-with-city-of-cockburn","status":"publish","type":"post","link":"https:\/\/archive.kanadevia-inova.com\/it\/hzi-consortium-signs-20-year-waste-supply-agreement-with-city-of-cockburn\/","title":{"rendered":"Australia: Kanadevia Inova Consortium Signs 20-Year Waste Supply Agreement with City of Cockburn"},"content":{"rendered":"<p><em>The City of Cockburn, a local government area of Perth, Western Australia (WA), has signed an agreement with a consortium led by Kanadevia Inova to supply waste to the East Rockingham Resource Recovery Facility (RRF) for a minimum of 20 years. The contract bolsters WA\u2019s long-term waste management strategy, under which Waste to Energy is regarded as an integral part of sustainable resource recovery. <\/em><br \/>\nOn November 2nd, a consortium led by Kanadevia Inova signed an agreement with the City of Cockburn (Cockburn) for the supply of waste to the East Rockingham Resource Recovery Facility for a minimum of 20 years. The agreement comes after the Kanadevia Inova consortium was named as preferred tenderer to process residual waste from the Perth Metro Area at an Waste to Energy (WtE) facility in March this year. Cockburn has undertaken a rigorous process to evaluate the best possible waste treatment technologies available worldwide and also to identify the best contracting models available for local government. The Kanadevia Inova technology was chosen based on numerous international credentials as well as the contracting model, which allows Cockburn the flexibility to revise and improve waste management practices continually going forward.<br \/>\n<strong>WtE as Integral Part of WA\u2019s Draft Waste Strategy<\/strong><br \/>\nThe finalization of the waste supply agreement (WSA) coincides with the release of WA\u2019s draft Waste Strategy 2030, through which the WA Government acknowledges for the first time that energy recovery from residual waste is a legitimate resource recovery process after all attempts to reuse and recycle have been exhausted. Enzo Gullotti, Chairman of New Energy Corporation (New Energy), a Perth-based waste-to-energy company and member of the consortium, which has been developing the East Rockingham site since 2013, noted, \u201cWaste to Energy projects should not and need not impede higher-order recovery processes for waste streams. Our contracting structure allows councils to recover as much resources from waste as they can and to educate communities on minimizing waste generation.\u201d<br \/>\n<strong>Waste Supply Contract Cost-Saving and Compliant with Local Waste Reduction Schemes <\/strong><br \/>\nUnder the terms of the agreement, the City of Cockburn will supply its residual waste to the RRF on a \u201cwaste arising basis\u201d, i.e. it will only pay for capacity it uses. This means there is no penalty for implementing waste reduction schemes, such as waste avoidance, reduction, and introducing a third bin for compostable organic waste.<br \/>\nCity of Cockburn Waste Manager Lyall Davieson said the WSA represented significant savings for ratepayers and would furthermore divert greater volumes of waste from landfill. He went on: \u201cWaste disposal at landfill sites attracts an ever-increasing State Government landfill levy, which is currently $70 per tonne. The State Government has determined that no further landfills will be approved on the Swan Coastal Plain. The WtE process is environmentally favorable to landfill in that calorific materials are converted for energy production.\u201d<br \/>\nThe East Rockingham Resource Recovery Facility will convert approximately 330,000 tonnes of waste per year into clean, renewable energy, producing 29 megawatts of baseload electricity. This is enough to power 36,000 homes. The project represents a $400 million private sector investment in the Perth metro area, creating 300 jobs during construction and 50 full-time jobs throughout its 30+-year operating life.<br \/>\n<strong>Strong Consortium for Integrated Waste Treatment Solutions<\/strong><br \/>\nThe consortium that has developed and will deliver the project is led by Kanadevia Inova, a global leader in WtE technology and turnkey delivery of waste-to-energy projects. Kanadevia Inova\u2019s partners in the project are New Energy Corporation and Tribe Infrastructure Group, an international advisory and investment firm specializing in the development and financing of complex infrastructure transactions. Kanadevia Inova will act as the technology provider, engineering and construction contractor and will execute a long-term operations and maintenance contract for the project as a joint venture with New Energy.<br \/>\nKanadevia Inova Managing Director Australia, Dr. Marc Stammbach, emphasizes the company\u2019s considerable experience in developing, constructing, and operating waste-to-energy plants worldwide. \u201cWe have successfully delivered projects in major global capitals such as London and Paris. Importantly, we stay with the project from conception through construction, and, once the project is commissioned, we then lead the operations and maintenance activities for the life of the plant. This continuity will ensure Perth\u2019s first waste-to-energy project is a successful one.\u201d<br \/>\nMr. Gullotti from New Energy commented, \u201cThis is the second successive contract awarded to our consortium. Councils are acknowledging that the Kanadevia Inova consortium has the right credentials on which to base a 20-year relationship.\u201d<br \/>\nThe consortium is now working through pre-engineering and the update of the site environmental approval. The project is scheduled to start construction in March of 2019.<br \/>\n<a href=\"https:\/\/archive.kanadevia-inova.com\/files\/2018\/11\/HZI-Media-Release_20-Year-Agreement-with-City-of-Cockburn.pdf\" rel=\"noopener noreferrer\" target=\"_blank\">Download Media Release Kanadevia Inova.<\/a><br \/>\n<a href=\"https:\/\/archive.kanadevia-inova.com\/files\/2018\/11\/City-of-Cockburn-Media-Release.pdf\" rel=\"noopener noreferrer\" target=\"_blank\">Download Media Release City of Cockburn. <\/a><br \/>\n<a href=\"https:\/\/archive.kanadevia-inova.com\/files\/2018\/11\/MM_Cockburn_Contract-Signing.jpg\" rel=\"noopener noreferrer\" target=\"_blank\">Download picture of the contract signing.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The City of Cockburn, a local government area of Perth, Western Australia (WA), has signed an agreement with a consortium led&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[158],"tags":[],"class_list":["post-6899","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/posts\/6899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/comments?post=6899"}],"version-history":[{"count":0,"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/posts\/6899\/revisions"}],"wp:attachment":[{"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/media?parent=6899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/categories?post=6899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.kanadevia-inova.com\/it\/wp-json\/wp\/v2\/tags?post=6899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}